Research Projects

Date

Name

Position

Project Number

Project Sources

2015.07

~2017.07

A study on optimal risk management methods for utilizing underground space under existing buildings

HEAD

15DZ1204005 East China Architectural Design & Research Institute

2015.01

~2016.12

An assessment of resources & study on methods for utilizing and developing deep underground space

HEAD

14DZ1207803 Science and Technology Commission of Shanghai Municipality

2015.03

~present

A study on interaction theories between shallow buried oval shield tunnels and geological formation & the application of multiple risk management theory

HEAD

2015-SK-01 STEC

2015.04

~present

 

The development of large section oval shield tunnel & the calculation and analysis of the application theory of construction technology

HEAD

14DZ1207900 Science and Technology Commission of Shanghai Municipality

2015.03

~present

A basic research on the safeness of high water pressured large long shield tunnels when crossing river (A seed research of a 973 project)

HEAD

SQ2015CB070563 Ministry of Science and Technology of the People's Republic of China

2014.08

~present

Test Study of concrete

reinforced by Barchips synthetic fiber

HEAD

 

Shanghai Road

and Bridge

(Group) Co. Ltd

2014.03

~present

Study on the joints of

immersed tube tunnel

HEAD

 

TEC Company

(Netherlands)

2013.04

~2014.03

Application of BIM

Technology on

Subway Station

HEAD

20130

644

GCG

2013.01

~2015.12

Study on the Excavation

and Conveying Mechanism of Lunar

Regolith by Pneumatics and its

Application in Lunar Bases

Construction

HEAD

2012007

2110025

Doctoral Program of

Chinese Ministry of

Education

2013.01

~2014.01

Information Report on

Mechanized Tunneling and

Strategic Development

Proposals in Mainland China

HEAD

20130530

Herrenknecht

2012.07

~2012.12

Study on the Formation

Mechanism of Super Large

Diameter and Long

Distance Pipe Jacking

Mud Lubrication Set

HEAD

BY

SMGG

2012.07

~2012.10

Strategy of Sustainable

Development Proposals on

Organization and

Management

HEAD

BY

National Slurry

Balance

Shield Construction

Engineering

Technology

Research Center

2012.01

~2015.12

Secondary Phrase-

Transiting Characteristics

and the Strength Properties

of Frozen Salty Offshore Soils

MEMBER

5117

8336

National Natural

Science

Foundation of

China

2012

~ 2013

Feasibility Study of the

Trans-Himalayas China-Nepal-India Railway Project

HEAD

 

ROBBINS

2012

~ 2013

The Influence Rules of Shield

Construction in Complex

Information on the Strata

HEAD

BY

STEC

2011.12

~2013.12

Key Technologies of Disaster

Prevention and Reduction of

Offshore Extra Long

Immersed Tube

HEAD

2011

3029

National Support

Plan_MOST

2011.01

~2013.12

Deformation Behavior and

Deformation Control of Soft

Soil based on Micro

Soil Mechanics, Life-cycle

Probabilistic Risk Management

and Reliability Maintenance

Theory of Underground Structures

KEY

MEMBER

PCSIRT,

IRT1029

Program for Changjiang

Scholars and Innovative

Research Team in

University

2010.11

~2012.10

Study on the Science and

Technology of Large River

crossing Shield Tunnel

HEAD

2010

2781

INSIGMA

2010.07

~ now

National Sci-Tech Support Plan

NO.5 Issue Key Techniques of

Transnational Tunnel-Island-Bridge Cluster Engineering,

Disaster Prevention and

Reduction, Energy Saving

and Environment Protection.

NO.4Sub-Project

HEAD

 

National Sci-Tech

Support Plan

2009.09

~2009.12

Research on the Long-Term

Monitoring of Important

Underground Structure

HEAD

2010

0931

STEDI

2009.09

~2009.12

Joint Waterproofing System

MaintenanceTechnology in

Shanghai Outer Ring

Tunnel Structure

 

2009

1826

SMGG

2007.08

~ 2010.12

Construction Technology of

Large Diameter Tunnel by an

EPBM with Shallow

Overburden and Protection

of Surrounding Heritage

Buildings

HEAD

2008-8

Shanghai Urban

Construction and

Communications

Commission